leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

Consider the Sy2 reaction between 1-bromo-2-methylpropane and methoxide. Add curved arrows to the starting materials to indicate the flow of electrons. Draw th
work out values a,b,c,d
What is the measure of a central angle if each interior angle equals 60°?
Tell whether the figure is a polygon. If it is a polygon, name it by the number of its sides. O polygon, hexagon O polygon, dodecagon polygon, decagon O not a p
A 2 kg mass starts from rest and slides down an inclined plane 4 m long in 1 second. What net force is acting on the mass along the incline *.
2. ¿Cómo están los chicos? ¿Qué deben pedir de plato principal? ¿De postre? Y para beber?
For the best results when shooting a moving subject within a scene, a digital camera should be set to _____ mode.
What do you think happened to the light from the lightbulb as it passed through the spectroscopy telescope?
1. (8.5d) A compound has a formula Mg:(PO.). Which best describes the atoms that make up this compound? A. B. Atom Magnesium (Mg) phosphorus (0) Oxygen (0) Numb
Do you like my drawings OwO